Leon Smith Pkwy. over Choccolocco Creek
GoodCalhoun County, Alabama · .5MI.SO.GOLDEN SPR./I20 · Structure no. 018333
- Built
- 2003
- 22 years old
- Condition
- Good
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 491 ft
- 5 main spans
- Daily traffic
- 1,000
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Leon Smith Pkwy. over Choccolocco Creek is a prestressed concrete stringer/multi-beam or girder carrying Leon Smith Pkwy. over Choccolocco Creek in Calhoun County, Alabama. It was built in 2003, so it is 22 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,000 vehicles a day, projected to reach 1,040 by 2043. The structure is 491 ft (149.7 m) long and 42 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Leon Smith Pkwy. over Choccolocco Creek built?
It was built in 2003, making it 22 years old in 2025.
What condition is Leon Smith Pkwy. over Choccolocco Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2023.
How much traffic does Leon Smith Pkwy. over Choccolocco Creek carry?
About 1,000 vehicles per day (2023 count).
How long is Leon Smith Pkwy. over Choccolocco Creek?
The structure is 491 ft (149.7 m) long with a longest span of 98 ft (29.9 m) and a deck 42 ft wide.
Who owns Leon Smith Pkwy. over Choccolocco Creek?
It is owned by the City or Municipal Highway Agency.