US Bridges

Iron City Cutoff over Choccolocco Creek

Good

Calhoun County, Alabama · Iron City Cutoff · Structure no. 001198

Built
1935
90 years old, rebuilt 1993
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
245 ft
6 main spans
Daily traffic
537
2019 count
Owner
County
County Highway Agency

About this bridge

Iron City Cutoff over Choccolocco Creek is a prestressed concrete stringer/multi-beam or girder carrying Iron City Cutoff over Choccolocco Creek in Calhoun County, Alabama. It was built in 1935 and reconstructed in 1993, so it is 90 years old, older than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 537 vehicles a day, roughly 1% of them trucks, projected to reach 881 by 2044. The structure is 245 ft (74.7 m) long and 31 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesIron City Cutoff
CrossesChoccolocco Creek
LocationIron City Cutoff
RouteCounty Highway 8
StateAlabama
Coordinates33.66414, -85.68743
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.8 US tons
Inventory rating36.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length245 ft (74.7 m)
Longest span75 ft (22.9 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic537 (2019)
Projected traffic881 by 2044
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.9 million (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Iron City Cutoff over Choccolocco Creek built?

It was built in 1935, making it 90 years old in 2025. It was reconstructed in 1993.

What condition is Iron City Cutoff over Choccolocco Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Iron City Cutoff over Choccolocco Creek carry?

About 537 vehicles per day (2019 count), of which roughly 1% are trucks.

How long is Iron City Cutoff over Choccolocco Creek?

The structure is 245 ft (74.7 m) long with a longest span of 75 ft (22.9 m) and a deck 31 ft wide.

Who owns Iron City Cutoff over Choccolocco Creek?

It is owned by the County Highway Agency.