Al. 106 over Furlong Crk. Relief
FairButler County, Alabama · 4.0 MI E Conecuh Co. Line · Structure no. 016003
- Built
- 1994
- 31 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 123 ft
- 3 main spans
- Daily traffic
- 350
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
Al. 106 over Furlong Crk. Relief is a prestressed concrete continuous stringer/multi-beam or girder carrying Al. 106 over Furlong Crk. Relief in Butler County, Alabama. It was built in 1994, so it is 31 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 350 vehicles a day, roughly 30% of them trucks, projected to reach 410 by 2033. The structure is 123 ft (37.5 m) long and 43 ft wide. If it were closed, the detour would be 19.3 mi (31 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Al. 106 over Furlong Crk. Relief built?
It was built in 1994, making it 31 years old in 2025.
What condition is Al. 106 over Furlong Crk. Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Al. 106 over Furlong Crk. Relief carry?
About 350 vehicles per day (2013 count), of which roughly 30% are trucks.
How long is Al. 106 over Furlong Crk. Relief?
The structure is 123 ft (37.5 m) long with a longest span of 41 ft (12.5 m) and a deck 43 ft wide.
Who owns Al. 106 over Furlong Crk. Relief?
It is owned by the State Highway Agency.