County Road 8 over Relief to Conecuh River
GoodBullock County, Alabama · Sec 31 T12 R23 · Structure no. 016160
- Built
- 1994
- 31 years old
- Condition
- Good
- inspected March 2024
- Type
- Channel Beam
- Concrete
- Length
- 136 ft
- 4 main spans
- Daily traffic
- 250
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
County Road 8 over Relief to Conecuh River is a concrete channel beam carrying County Road 8 over Relief to Conecuh River in Bullock County, Alabama. It was built in 1994, so it is 31 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 250 vehicles a day, roughly 5% of them trucks, projected to reach 450 by 2044. The structure is 136 ft (41.5 m) long and 27 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road 8 over Relief to Conecuh River built?
It was built in 1994, making it 31 years old in 2025.
What condition is County Road 8 over Relief to Conecuh River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.
How much traffic does County Road 8 over Relief to Conecuh River carry?
About 250 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is County Road 8 over Relief to Conecuh River?
The structure is 136 ft (41.5 m) long with a longest span of 34 ft (10.4 m) and a deck 27 ft wide.
Who owns County Road 8 over Relief to Conecuh River?
It is owned by the County Highway Agency.