US Bridges

County Road 50 over Big Sandy

Good

Bullock County, Alabama · Sec 20 T12 R24 · Structure no. 012799

Built
1982
43 years old
Condition
Good
inspected April 2024
Type
Culvert
Concrete
Length
32 ft
3 main spans
Daily traffic
100
2024 count
Owner
County
County Highway Agency

About this bridge

County Road 50 over Big Sandy is a concrete culvert carrying County Road 50 over Big Sandy in Bullock County, Alabama. It was built in 1982, so it is 43 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 100 vehicles a day, projected to reach 150 by 2044. The structure is 32 ft (9.8 m) long. If it were closed, the detour would be 11.2 mi (18 km).

CarriesCounty Road 50
CrossesBig Sandy
LocationSec 20 T12 R24
RouteCounty Highway 50
StateAlabama
Coordinates31.9988, -85.66342
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Culvert7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating96.9 US tons
Inventory rating58.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length32 ft (9.8 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (2024)
Projected traffic150 by 2044
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.2 mi (18 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$334,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was County Road 50 over Big Sandy built?

It was built in 1982, making it 43 years old in 2025.

What condition is County Road 50 over Big Sandy in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does County Road 50 over Big Sandy carry?

About 100 vehicles per day (2024 count).

How long is County Road 50 over Big Sandy?

The structure is 32 ft (9.8 m) long with a longest span of 10 ft (3 m).

Who owns County Road 50 over Big Sandy?

It is owned by the County Highway Agency.