Remlap Drive over Little Warrior (relief)
GoodBlount County, Alabama · 1 MI S of Inland · Structure no. 018371
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected January 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 274 ft
- 4 main spans
- Daily traffic
- 805
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Remlap Drive over Little Warrior (relief) is a prestressed concrete stringer/multi-beam or girder carrying Remlap Drive over Little Warrior (relief) in Blount County, Alabama. It was built in 2005, so it is 20 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 805 vehicles a day, roughly 2% of them trucks, projected to reach 1,196 by 2042. The structure is 274 ft (83.5 m) long and 31 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Remlap Drive over Little Warrior (relief) built?
It was built in 2005, making it 20 years old in 2025.
What condition is Remlap Drive over Little Warrior (relief) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.
How much traffic does Remlap Drive over Little Warrior (relief) carry?
About 805 vehicles per day (2022 count), of which roughly 2% are trucks.
How long is Remlap Drive over Little Warrior (relief)?
The structure is 274 ft (83.5 m) long with a longest span of 60 ft (18.3 m) and a deck 31 ft wide.
Who owns Remlap Drive over Little Warrior (relief)?
It is owned by the County Highway Agency.