Al - 53 (us 231) over Locust Fk of Warrior Riv
GoodBlount County, Alabama · 2.7 Mi. No. Al 160 · Structure no. 018188
- Built
- 2007
- 18 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 540 ft
- 4 main spans
- Daily traffic
- 6,730
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Al - 53 (us 231) over Locust Fk of Warrior Riv is a prestressed concrete stringer/multi-beam or girder carrying Al - 53 (us 231) over Locust Fk of Warrior Riv in Blount County, Alabama. It was built in 2007, so it is 18 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,730 vehicles a day, roughly 12% of them trucks, projected to reach 8,748 by 2043. The structure is 540 ft (164.6 m) long and 47 ft wide. If it were closed, the detour would be 14.9 mi (24 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Al - 53 (us 231) over Locust Fk of Warrior Riv built?
It was built in 2007, making it 18 years old in 2025.
What condition is Al - 53 (us 231) over Locust Fk of Warrior Riv in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Al - 53 (us 231) over Locust Fk of Warrior Riv carry?
About 6,730 vehicles per day (2023 count), of which roughly 12% are trucks.
How long is Al - 53 (us 231) over Locust Fk of Warrior Riv?
The structure is 540 ft (164.6 m) long with a longest span of 135 ft (41.1 m) and a deck 47 ft wide.
Who owns Al - 53 (us 231) over Locust Fk of Warrior Riv?
It is owned by the State Highway Agency.