US Bridges

Leiterman Road over Palmetto Creek

Good

Baldwin County, Alabama · 1.6 Miles East of CR 95 · Structure no. 021678

Built
2023
2 years old
Condition
Good
inspected July 2023
Type
Culvert
Concrete
Length
24 ft
2 main spans
Daily traffic
400
2023 count
Owner
County
County Highway Agency

About this bridge

Leiterman Road over Palmetto Creek is a concrete culvert carrying Leiterman Road over Palmetto Creek in Baldwin County, Alabama. It was built in 2023, so it is 2 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 400 vehicles a day, roughly 1% of them trucks, projected to reach 520 by 2043. The structure is 24 ft (7.3 m) long. If it were closed, the detour would be 9.9 mi (16 km).

CarriesLeiterman Road
CrossesPalmetto Creek
Location1.6 Miles East of CR 95
RouteCounty Highway 0
StateAlabama
Coordinates30.37033, -87.51994
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98 US tons
Inventory rating98 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length24 ft (7.3 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic400 (2023)
Projected traffic520 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$403,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was Leiterman Road over Palmetto Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is Leiterman Road over Palmetto Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Leiterman Road over Palmetto Creek carry?

About 400 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Leiterman Road over Palmetto Creek?

The structure is 24 ft (7.3 m) long with a longest span of 12 ft (3.7 m).

Who owns Leiterman Road over Palmetto Creek?

It is owned by the County Highway Agency.