Baldwin County, Alabama · .75 MI East of CR 83 · Structure no. 021668

Built
2022
3 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
50
2022 count
Owner
County
County Highway Agency

About this bridge

CO RD 34 over Trib to Negro Creek is a concrete culvert carrying CO RD 34 over Trib to Negro Creek in Baldwin County, Alabama. It was built in 2022, so it is 3 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 100 by 2042. The structure is 22 ft (6.7 m) long and 51 ft wide.

CarriesCO RD 34
CrossesTrib to Negro Creek
Location.75 MI East of CR 83
RouteCounty Highway 0
StateAlabama
Coordinates30.48713, -87.66149
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert9 ExcellentNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating98 US tons
Inventory rating85.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20
Structure length22 ft (6.7 m)
Longest span10 ft (3 m)
Deck width51 ft (15.5 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic50 (2022)
Projected traffic100 by 2042
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$421,000 (2025 estimate)
NavigationNo navigation control on waterway

Frequently asked questions

When was CO RD 34 over Trib to Negro Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is CO RD 34 over Trib to Negro Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does CO RD 34 over Trib to Negro Creek carry?

About 50 vehicles per day (2022 count).

How long is CO RD 34 over Trib to Negro Creek?

The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 51 ft wide.

Who owns CO RD 34 over Trib to Negro Creek?

It is owned by the County Highway Agency.