US Bridges

_s. Pecan St. over _trib. to Wolf Creek

Good

Baldwin County, Alabama · _500' S. of US 98 · Structure no. 021212

Built
2015
10 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
36 ft
3 main spans
Daily traffic
52
2023 count
Owner
City
City or Municipal Highway Agency

About this bridge

_s. Pecan St. over _trib. to Wolf Creek is a concrete culvert carrying _s. Pecan St. over _trib. to Wolf Creek in Baldwin County, Alabama. It was built in 2015, so it is 10 years old, younger than the Alabama average of 51.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 52 vehicles a day, projected to reach 70 by 2043. The structure is 36 ft (11 m) long. If it were closed, the detour would be 1.9 mi (3 km).

Carries_s. Pecan St.
Crosses_trib. to Wolf Creek
Location_500' S. of US 98
RouteCity Street 0
StateAlabama
Coordinates30.40518, -87.66637
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection9 ExcellentNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating47.1 US tons
Inventory rating28.2 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHS 20
Structure length36 ft (11 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic52 (2023)
Projected traffic70 by 2043
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost$495,000 (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was _s. Pecan St. over _trib. to Wolf Creek built?

It was built in 2015, making it 10 years old in 2025.

What condition is _s. Pecan St. over _trib. to Wolf Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does _s. Pecan St. over _trib. to Wolf Creek carry?

About 52 vehicles per day (2023 count).

How long is _s. Pecan St. over _trib. to Wolf Creek?

The structure is 36 ft (11 m) long with a longest span of 10 ft (3 m).

Who owns _s. Pecan St. over _trib. to Wolf Creek?

It is owned by the City or Municipal Highway Agency.