Willowbridge Dr. over Br. Off Point Clear Cr.
FairBaldwin County, Alabama · 0.5 Mi. W. of Co. Rd. 3 · Structure no. 019841
- Built
- 2000
- 25 years old
- Condition
- Fair
- inspected October 2024
- Type
- Culvert
- Concrete
- Length
- 31 ft
- 3 main spans
- Daily traffic
- 60
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
Willowbridge Dr. over Br. Off Point Clear Cr. is a concrete culvert carrying Willowbridge Dr. over Br. Off Point Clear Cr. in Baldwin County, Alabama. It was built in 2000, so it is 25 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 60 vehicles a day, projected to reach 85 by 2042. The structure is 31 ft (9.4 m) long and 63 ft wide. If it were closed, the detour would be 98.2 mi (158 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 8 Very Good | No problems noted. |
| Culvert | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Willowbridge Dr. over Br. Off Point Clear Cr. built?
It was built in 2000, making it 25 years old in 2025.
What condition is Willowbridge Dr. over Br. Off Point Clear Cr. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Willowbridge Dr. over Br. Off Point Clear Cr. carry?
About 60 vehicles per day (2022 count).
How long is Willowbridge Dr. over Br. Off Point Clear Cr.?
The structure is 31 ft (9.4 m) long with a longest span of 10 ft (3 m) and a deck 63 ft wide.
Who owns Willowbridge Dr. over Br. Off Point Clear Cr.?
It is owned by the County Highway Agency.