CO.RD.40 over Swift Creek Relief
GoodAutauga County, Alabama · 1.0 Mi. E of Independence · Structure no. 018249
- Built
- 2002
- 23 years old
- Condition
- Good
- inspected December 2024
- Type
- Channel Beam
- Concrete
- Length
- 204 ft
- 6 main spans
- Daily traffic
- 560
- 2001 count
- Owner
- County
- County Highway Agency
About this bridge
CO.RD.40 over Swift Creek Relief is a concrete channel beam carrying CO.RD.40 over Swift Creek Relief in Autauga County, Alabama. It was built in 2002, so it is 23 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 560 vehicles a day, roughly 2% of them trucks, projected to reach 1,020 by 2030. The structure is 204 ft (62.2 m) long and 31 ft wide. If it were closed, the detour would be 8.1 mi (13 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO.RD.40 over Swift Creek Relief built?
It was built in 2002, making it 23 years old in 2025.
What condition is CO.RD.40 over Swift Creek Relief in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does CO.RD.40 over Swift Creek Relief carry?
About 560 vehicles per day (2001 count), of which roughly 2% are trucks.
How long is CO.RD.40 over Swift Creek Relief?
The structure is 204 ft (62.2 m) long with a longest span of 34 ft (10.4 m) and a deck 31 ft wide.
Who owns CO.RD.40 over Swift Creek Relief?
It is owned by the County Highway Agency.