Co.Rd. 69 over Swift Creek
FairPosted for loadAutauga County, Alabama · Vida · Structure no. 011993
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected October 2023
- Type
- Channel Beam
- Concrete
- Length
- 95 ft
- 5 main spans
- Daily traffic
- 151
- 2005 count
- Owner
- County
- County Highway Agency
About this bridge
Co.Rd. 69 over Swift Creek is a concrete channel beam carrying Co.Rd. 69 over Swift Creek in Autauga County, Alabama. It was built in 1978, so it is 47 years old, younger than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 151 vehicles a day, roughly 10% of them trucks, projected to reach 225 by 2030. The structure is 95 ft (29 m) long and 26 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Co.Rd. 69 over Swift Creek built?
It was built in 1978, making it 47 years old in 2025.
What condition is Co.Rd. 69 over Swift Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Co.Rd. 69 over Swift Creek carry?
About 151 vehicles per day (2005 count), of which roughly 10% are trucks.
How long is Co.Rd. 69 over Swift Creek?
The structure is 95 ft (29 m) long with a longest span of 19 ft (5.8 m) and a deck 26 ft wide.
Who owns Co.Rd. 69 over Swift Creek?
It is owned by the County Highway Agency.