CO.RD.9 over Ivy Creek
FairPosted for loadAutauga County, Alabama · Peace Rd. · Structure no. 008262
- Built
- 1964
- 61 years old
- Condition
- Fair
- inspected December 2023
- Type
- Tee Beam
- Concrete
- Length
- 138 ft
- 3 main spans
- Daily traffic
- 192
- 1988 count
- Owner
- County
- County Highway Agency
About this bridge
CO.RD.9 over Ivy Creek is a concrete tee beam carrying CO.RD.9 over Ivy Creek in Autauga County, Alabama. It was built in 1964, so it is 61 years old, older than the Alabama average of 51.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 192 vehicles a day, roughly 10% of them trucks, projected to reach 205 by 2030. The structure is 138 ft (42.1 m) long and 24 ft wide. If it were closed, the detour would be 8.7 mi (14 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO.RD.9 over Ivy Creek built?
It was built in 1964, making it 61 years old in 2025.
What condition is CO.RD.9 over Ivy Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does CO.RD.9 over Ivy Creek carry?
About 192 vehicles per day (1988 count), of which roughly 10% are trucks.
How long is CO.RD.9 over Ivy Creek?
The structure is 138 ft (42.1 m) long with a longest span of 46 ft (14 m) and a deck 24 ft wide.
Who owns CO.RD.9 over Ivy Creek?
It is owned by the County Highway Agency.