US Bridges

Totchaket Road over East Middle River

Good

Yukon-Koyukuk Census Area, Alaska · Mile Point 2.1 · Structure no. 1559

Built
2024
1 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
121 ft
1 main span
Daily traffic
10
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Totchaket Road over East Middle River is a steel stringer/multi-beam or girder carrying Totchaket Road over East Middle River in Yukon-Koyukuk Census Area, Alaska. It was built in 2024, so it is 1 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, roughly 1% of them trucks, projected to reach 15 by 2035. The structure is 121 ft (37 m) long and 27 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesTotchaket Road
CrossesEast Middle River
LocationMile Point 2.1
RouteCity Street 0
StateAlaska
Coordinates64.56032, -149.18541
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating104.6 US tons
Inventory rating62.7 US tons

Structure

MaterialSteel
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length121 ft (37 m)
Longest span117 ft (35.7 m)
Deck width27 ft (8.1 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2018)
Projected traffic15 by 2035
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Totchaket Road over East Middle River built?

It was built in 2024, making it 1 years old in 2025.

What condition is Totchaket Road over East Middle River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Totchaket Road over East Middle River carry?

About 10 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is Totchaket Road over East Middle River?

The structure is 121 ft (37 m) long with a longest span of 117 ft (35.7 m) and a deck 27 ft wide.

Who owns Totchaket Road over East Middle River?

It is owned by the City or Municipal Highway Agency.