Irr:steese Highway over Albert Creek
GoodYukon-Koyukuk Census Area, Alaska · Mile Point 125.5 · Structure no. 0833
- Built
- 1978
- 47 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 76 ft
- 1 main span
- Daily traffic
- 110
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Irr:steese Highway over Albert Creek is a wood or timber stringer/multi-beam or girder carrying Irr:steese Highway over Albert Creek in Yukon-Koyukuk Census Area, Alaska. It was built in 1978, so it is 47 years old, older than the Alaska average of 35.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 110 vehicles a day, roughly 13% of them trucks, projected to reach 150 by 2039. The structure is 76 ft (23.2 m) long and 29 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Irr:steese Highway over Albert Creek built?
It was built in 1978, making it 47 years old in 2025.
What condition is Irr:steese Highway over Albert Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Irr:steese Highway over Albert Creek carry?
About 110 vehicles per day (2020 count), of which roughly 13% are trucks.
How long is Irr:steese Highway over Albert Creek?
The structure is 76 ft (23.2 m) long with a longest span of 62 ft (18.9 m) and a deck 29 ft wide.
Who owns Irr:steese Highway over Albert Creek?
It is owned by the State Highway Agency.