Sterling L/Ophir over Tatalina River
FairPosted for loadYukon-Koyukuk Census Area, Alaska · Mile Point 12.5 · Structure no. 0462
- Built
- 1947
- 78 years old
- Condition
- Fair
- inspected July 2024
- Type
- Truss - Thru
- Steel
- Length
- 61 ft
- 1 main span
- Daily traffic
- 45
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
Sterling L/Ophir over Tatalina River is a steel truss - thru carrying Sterling L/Ophir over Tatalina River in Yukon-Koyukuk Census Area, Alaska. It was built in 1947, so it is 78 years old, older than the Alaska average of 35.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 45 vehicles a day, roughly 6% of them trucks, projected to reach 70 by 2035. The structure is 61 ft (18.6 m) long and 12 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sterling L/Ophir over Tatalina River built?
It was built in 1947, making it 78 years old in 2025.
What condition is Sterling L/Ophir over Tatalina River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Sterling L/Ophir over Tatalina River carry?
About 45 vehicles per day (2018 count), of which roughly 6% are trucks.
How long is Sterling L/Ophir over Tatalina River?
The structure is 61 ft (18.6 m) long with a longest span of 60 ft (18.3 m) and a deck 12 ft wide.
Who owns Sterling L/Ophir over Tatalina River?
It is owned by the State Highway Agency.