US Bridges

Fdr 6590 over Stream - Perm

Good

Wrangell City and Borough, Alaska · Zarembo Island · Structure no. 100220000001226

Built
1985
40 years old, rebuilt 2007
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
100 ft
1 main span
Daily traffic
5
2006 count
Owner
Federal
U.S. Forest Service

About this bridge

Fdr 6590 over Stream - Perm is a wood or timber stringer/multi-beam or girder carrying Fdr 6590 over Stream - Perm in Wrangell City and Borough, Alaska. It was built in 1985 and reconstructed in 2007, so it is 40 years old, older than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5 vehicles a day, projected to reach 7 by 2045. The structure is 100 ft (30.5 m) long and 16 ft wide. If it were closed, the detour would be 41.6 mi (67 km).

CarriesFdr 6590
CrossesStream - Perm
LocationZarembo Island
RouteFederal Lands Road 6590
StateAlaska
Coordinates56.34857, -132.73014
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations on dry land well above flood water elevations
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating60 US tons
Inventory rating46.4 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans1
Design loadOther
Structure length100 ft (30.5 m)
Longest span96 ft (29.3 m)
Deck width16 ft (4.9 m)
Roadway width15 ft (4.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5 (2006)
Projected traffic7 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed41.6 mi (67 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Fdr 6590 over Stream - Perm built?

It was built in 1985, making it 40 years old in 2025. It was reconstructed in 2007.

What condition is Fdr 6590 over Stream - Perm in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Fdr 6590 over Stream - Perm carry?

About 5 vehicles per day (2006 count).

How long is Fdr 6590 over Stream - Perm?

The structure is 100 ft (30.5 m) long with a longest span of 96 ft (29.3 m) and a deck 16 ft wide.

Who owns Fdr 6590 over Stream - Perm?

It is owned by the U.S. Forest Service.