US Bridges

No Data Entered over No Data Entered

Good

Prince of Wales-Hyder Census Area, Alaska · Thorne Bay · Structure no. 100554000033680

Built
2018
7 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
50 ft
1 main span
Daily traffic
50
2018 count
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over No Data Entered is a steel stringer/multi-beam or girder carrying No Data Entered over No Data Entered in Prince of Wales-Hyder Census Area, Alaska. It was built in 2018, so it is 7 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 50 ft (15.2 m) long and 18 ft wide. If it were closed, the detour would be 620.7 mi (999 km).

CarriesNo Data Entered
CrossesNo Data Entered
LocationThorne Bay
RouteFederal Lands Road 30000
StateAlaska
Coordinates55.8106, -132.5106
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating31.7 US tons
Inventory rating24.7 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadHL 93
Structure length50 ft (15.2 m)
Longest span48 ft (14.6 m)
Deck width18 ft (5.5 m)
Roadway width16 ft (4.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2018)
Projected traffic75 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed620.7 mi (999 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over No Data Entered built?

It was built in 2018, making it 7 years old in 2025.

What condition is No Data Entered over No Data Entered in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does No Data Entered over No Data Entered carry?

About 50 vehicles per day (2018 count).

How long is No Data Entered over No Data Entered?

The structure is 50 ft (15.2 m) long with a longest span of 48 ft (14.6 m) and a deck 18 ft wide.

Who owns No Data Entered over No Data Entered?

It is owned by the U.S. Forest Service.