US Bridges

No Data Entered over No Data Entered

Fair

Prince of Wales-Hyder Census Area, Alaska · Shaheen · Structure no. 100554000003393

Built
2004
21 years old, rebuilt 2005
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
57 ft
1 main span
Daily traffic
—
2006 count
Owner
Federal
U.S. Forest Service

About this bridge

No Data Entered over No Data Entered is a wood or timber stringer/multi-beam or girder carrying No Data Entered over No Data Entered in Prince of Wales-Hyder Census Area, Alaska. It was built in 2004 and reconstructed in 2005, so it is 21 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

No traffic count is recorded. The structure is 57 ft (17.5 m) long and 19 ft wide. If it were closed, the detour would be 98.2 mi (158 km).

CarriesNo Data Entered
CrossesNo Data Entered
LocationShaheen
RouteFederal Lands Road 20500
StateAlaska
Coordinates55.6731, -133.1764
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating31.4 US tons
Inventory rating24.3 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans1
Design loadOther
Structure length57 ft (17.5 m)
Longest span48 ft (14.7 m)
Deck width19 ft (5.9 m)
Roadway width14 ft (4.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic—
Projected traffic—
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.2 mi (158 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was No Data Entered over No Data Entered built?

It was built in 2004, making it 21 years old in 2025. It was reconstructed in 2005.

What condition is No Data Entered over No Data Entered in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does No Data Entered over No Data Entered carry?

No traffic count is recorded for this structure.

How long is No Data Entered over No Data Entered?

The structure is 57 ft (17.5 m) long with a longest span of 48 ft (14.7 m) and a deck 19 ft wide.

Who owns No Data Entered over No Data Entered?

It is owned by the U.S. Forest Service.