2051000-0.28 over Perm
FairPrince of Wales-Hyder Census Area, Alaska · Shaheen · Structure no. 100540000001034
- Built
- 1987
- 38 years old, rebuilt 1992
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 100 ft
- 1 main span
- Daily traffic
- 10
- 2006 count
- Owner
- Federal
- U.S. Forest Service
About this bridge
2051000-0.28 over Perm is a wood or timber stringer/multi-beam or girder carrying 2051000-0.28 over Perm in Prince of Wales-Hyder Census Area, Alaska. It was built in 1987 and reconstructed in 1992, so it is 38 years old, older than the Alaska average of 35.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10 vehicles a day, projected to reach 10 by 2013. The structure is 100 ft (30.5 m) long and 16 ft wide. If it were closed, the detour would be 98.2 mi (158 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 2051000-0.28 over Perm built?
It was built in 1987, making it 38 years old in 2025. It was reconstructed in 1992.
What condition is 2051000-0.28 over Perm in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does 2051000-0.28 over Perm carry?
About 10 vehicles per day (2006 count).
How long is 2051000-0.28 over Perm?
The structure is 100 ft (30.5 m) long with a longest span of 96 ft (29.3 m) and a deck 16 ft wide.
Who owns 2051000-0.28 over Perm?
It is owned by the U.S. Forest Service.