IRR BIA Route 008 over Unnamed Stream
FairPrince of Wales-Hyder Census Area, Alaska · S of Klawock Lake 3.7 MI · Structure no. 0000E09108T0550
- Built
- 1990
- 35 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 26 ft
- 1 main span
- Daily traffic
- 1
- 2022 count
- Owner
- Tribal
- Indian Tribal Government
About this bridge
IRR BIA Route 008 over Unnamed Stream is a wood or timber stringer/multi-beam or girder carrying IRR BIA Route 008 over Unnamed Stream in Prince of Wales-Hyder Census Area, Alaska. It was built in 1990, so it is 35 years old, younger than the Alaska average of 35.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1 vehicles a day, projected to reach 5 by 2042. The structure is 26 ft (8 m) long and 13 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA Route 008 over Unnamed Stream built?
It was built in 1990, making it 35 years old in 2025.
What condition is IRR BIA Route 008 over Unnamed Stream in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does IRR BIA Route 008 over Unnamed Stream carry?
About 1 vehicles per day (2022 count).
How long is IRR BIA Route 008 over Unnamed Stream?
The structure is 26 ft (8 m) long with a longest span of 23 ft (7 m) and a deck 13 ft wide.
Who owns IRR BIA Route 008 over Unnamed Stream?
It is owned by the Indian Tribal Government.