US Bridges

Road over Stream

Good

Petersburg Census Area, Alaska · Mitkof Island · Structure no. 100521000003314

Built
1985
40 years old, rebuilt 1998
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
60 ft
1 main span
Daily traffic
10
2006 count
Owner
Federal
U.S. Forest Service

About this bridge

Road over Stream is a steel stringer/multi-beam or girder carrying Road over Stream in Petersburg Census Area, Alaska. It was built in 1985 and reconstructed in 1998, so it is 40 years old, older than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, projected to reach 15 by 2045. The structure is 60 ft (18.3 m) long and 18 ft wide. If it were closed, the detour would be 98.2 mi (158 km).

CarriesRoad
CrossesStream
LocationMitkof Island
RouteFederal Lands Road 6241
StateAlaska
Coordinates56.61292, -132.65004
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment5: Somewhat better than minimum adequacy to tolerate being left in place as is
Operating rating28.2 US tons
Inventory rating21.8 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadOther
Structure length60 ft (18.3 m)
Longest span58 ft (17.8 m)
Deck width18 ft (5.5 m)
Roadway width16 ft (4.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2006)
Projected traffic15 by 2045
Trucks—
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.2 mi (158 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerU.S. Forest Service
Maintained byU.S. Forest Service
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Road over Stream built?

It was built in 1985, making it 40 years old in 2025. It was reconstructed in 1998.

What condition is Road over Stream in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Road over Stream carry?

About 10 vehicles per day (2006 count).

How long is Road over Stream?

The structure is 60 ft (18.3 m) long with a longest span of 58 ft (17.8 m) and a deck 18 ft wide.

Who owns Road over Stream?

It is owned by the U.S. Forest Service.