US Bridges

Dalton Highway over Atigun River No. 2

Good

North Slope Borough, Alaska · Mile Point 271.3 · Structure no. 1333

Built
2000
25 years old
Condition
Good
inspected July 2024
Type
Tee Beam
Prestressed Concrete
Length
335 ft
3 main spans
Daily traffic
130
2020 count
Owner
State
State Highway Agency

About this bridge

Dalton Highway over Atigun River No. 2 is a prestressed concrete tee beam carrying Dalton Highway over Atigun River No. 2 in North Slope Borough, Alaska. It was built in 2000, so it is 25 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 130 vehicles a day, roughly 75% of them trucks, projected to reach 190 by 2039. The structure is 335 ft (102.1 m) long and 34 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesDalton Highway
CrossesAtigun River No. 2
LocationMile Point 271.3
RouteState Highway 65
StateAlaska
Coordinates68.45176, -149.37286
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating96.2 US tons
Inventory rating57.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans3
Design loadHL 93
Structure length335 ft (102.1 m)
Longest span111 ft (33.8 m)
Deck width34 ft (10.5 m)
Roadway width31 ft (9.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic130 (2020)
Projected traffic190 by 2039
Trucks75%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Dalton Highway over Atigun River No. 2 built?

It was built in 2000, making it 25 years old in 2025.

What condition is Dalton Highway over Atigun River No. 2 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Dalton Highway over Atigun River No. 2 carry?

About 130 vehicles per day (2020 count), of which roughly 75% are trucks.

How long is Dalton Highway over Atigun River No. 2?

The structure is 335 ft (102.1 m) long with a longest span of 111 ft (33.8 m) and a deck 34 ft wide.

Who owns Dalton Highway over Atigun River No. 2?

It is owned by the State Highway Agency.