US Bridges

Glenn Highway over Chickaloon River

Good

Matanuska-Susitna Borough, Alaska · Mile Point 70.5 · Structure no. 0545

Built
2016
9 years old
Condition
Good
inspected July 2023
Type
Tee Beam
Prestressed Concrete
Length
353 ft
3 main spans
Daily traffic
1,110
2020 count
Owner
State
State Highway Agency

About this bridge

Glenn Highway over Chickaloon River is a prestressed concrete tee beam carrying Glenn Highway over Chickaloon River in Matanuska-Susitna Borough, Alaska. It was built in 2016, so it is 9 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,110 vehicles a day, roughly 15% of them trucks, projected to reach 1,270 by 2039. The structure is 353 ft (107.6 m) long and 45 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesGlenn Highway
CrossesChickaloon River
LocationMile Point 70.5
RouteInterstate 0A15
StateAlaska
Coordinates61.78556, -148.45361
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJuly 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating68.5 US tons
Inventory rating31.5 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length353 ft (107.6 m)
Longest span150 ft (45.7 m)
Deck width45 ft (13.7 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,110 (2020)
Projected traffic1,270 by 2039
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Glenn Highway over Chickaloon River built?

It was built in 2016, making it 9 years old in 2025.

What condition is Glenn Highway over Chickaloon River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.

How much traffic does Glenn Highway over Chickaloon River carry?

About 1,110 vehicles per day (2020 count), of which roughly 15% are trucks.

How long is Glenn Highway over Chickaloon River?

The structure is 353 ft (107.6 m) long with a longest span of 150 ft (45.7 m) and a deck 45 ft wide.

Who owns Glenn Highway over Chickaloon River?

It is owned by the State Highway Agency.