US Bridges

Gravina Island HWY over Airport Creek

Good

Ketchikan Gateway Borough, Alaska · Mile Point 4.6 · Structure no. 2198

Built
2019
6 years old
Condition
Good
inspected June 2023
Type
Tee Beam
Prestressed Concrete
Length
100 ft
1 main span
Daily traffic
60
2018 count
Owner
State
State Highway Agency

About this bridge

Gravina Island HWY over Airport Creek is a prestressed concrete tee beam carrying Gravina Island HWY over Airport Creek in Ketchikan Gateway Borough, Alaska. It was built in 2019, so it is 6 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 60 vehicles a day, roughly 15% of them trucks, projected to reach 73 by 2035. The structure is 100 ft (30.5 m) long and 39 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesGravina Island HWY
CrossesAirport Creek
LocationMile Point 4.6
StateAlaska
Coordinates55.35604, -131.72932
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating96.7 US tons
Inventory rating44.5 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length100 ft (30.5 m)
Longest span97 ft (29.5 m)
Deck width39 ft (11.9 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic60 (2018)
Projected traffic73 by 2035
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Gravina Island HWY over Airport Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Gravina Island HWY over Airport Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Gravina Island HWY over Airport Creek carry?

About 60 vehicles per day (2018 count), of which roughly 15% are trucks.

How long is Gravina Island HWY over Airport Creek?

The structure is 100 ft (30.5 m) long with a longest span of 97 ft (29.5 m) and a deck 39 ft wide.

Who owns Gravina Island HWY over Airport Creek?

It is owned by the State Highway Agency.