US Bridges

North Tongass HWY over First Waterfall Creek

Good

Ketchikan Gateway Borough, Alaska · Mile Point 13.9 · Structure no. 0414

Built
2019
6 years old
Condition
Good
inspected June 2023
Type
Tee Beam
Prestressed Concrete
Length
145 ft
1 main span
Daily traffic
330
2020 count
Owner
State
State Highway Agency

About this bridge

North Tongass HWY over First Waterfall Creek is a prestressed concrete tee beam carrying North Tongass HWY over First Waterfall Creek in Ketchikan Gateway Borough, Alaska. It was built in 2019, so it is 6 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 330 vehicles a day, roughly 10% of them trucks, projected to reach 1,140 by 2039. The structure is 145 ft (44.3 m) long and 39 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesNorth Tongass HWY
CrossesFirst Waterfall Creek
LocationMile Point 13.9
RouteState Highway NSP00
StateAlaska
Coordinates55.48694, -131.76556
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating101.3 US tons
Inventory rating60.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length145 ft (44.3 m)
Longest span142 ft (43.4 m)
Deck width39 ft (12 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic330 (2020)
Projected traffic1,140 by 2039
Trucks10%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was North Tongass HWY over First Waterfall Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is North Tongass HWY over First Waterfall Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does North Tongass HWY over First Waterfall Creek carry?

About 330 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is North Tongass HWY over First Waterfall Creek?

The structure is 145 ft (44.3 m) long with a longest span of 142 ft (43.4 m) and a deck 39 ft wide.

Who owns North Tongass HWY over First Waterfall Creek?

It is owned by the State Highway Agency.