South Tongass HWY over Herring Cove

Good

Ketchikan Gateway Borough, Alaska · Mile Point 10.7 · Structure no. 0253

Built
2022
3 years old
Condition
Good
inspected June 2023
Type
Tee Beam
Prestressed Concrete
Length
131 ft
1 main span
Daily traffic
820
2020 count
Owner
State
State Highway Agency

About this bridge

South Tongass HWY over Herring Cove is a prestressed concrete tee beam carrying South Tongass HWY over Herring Cove in Ketchikan Gateway Borough, Alaska. It was built in 2022, so it is 3 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 820 vehicles a day, roughly 13% of them trucks, projected to reach 1,750 by 2039. The structure is 131 ft (40 m) long and 49 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesSouth Tongass HWY
CrossesHerring Cove
LocationMile Point 10.7
RouteState Highway 902
StateAlaska
Coordinates55.3265, -131.5251
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating71.7 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length131 ft (40 m)
Longest span128 ft (39 m)
Deck width49 ft (14.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic820 (2020)
Projected traffic1,750 by 2039
Trucks13%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was South Tongass HWY over Herring Cove built?

It was built in 2022, making it 3 years old in 2025.

What condition is South Tongass HWY over Herring Cove in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does South Tongass HWY over Herring Cove carry?

About 820 vehicles per day (2020 count), of which roughly 13% are trucks.

How long is South Tongass HWY over Herring Cove?

The structure is 131 ft (40 m) long with a longest span of 128 ft (39 m) and a deck 49 ft wide.

Who owns South Tongass HWY over Herring Cove?

It is owned by the State Highway Agency.