US Bridges

Exit Glacier Road over Resurrection River

Fair

Kenai Peninsula Borough, Alaska · 7.5 Miles West of Seward · Structure no. 9845001P0000000

Built
1985
40 years old
Condition
Fair
inspected August 2023
Type
Box Beam or Girders - Single or Spread
Concrete Continuous
Length
250 ft
2 main spans
Daily traffic
200
2013 count
Owner
Federal
National Park Service

About this bridge

Exit Glacier Road over Resurrection River is a concrete continuous box beam or girders - single or spread carrying Exit Glacier Road over Resurrection River in Kenai Peninsula Borough, Alaska. It was built in 1985, so it is 40 years old, older than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 200 vehicles a day, roughly 2% of them trucks, projected to reach 500 by 2033. The structure is 250 ft (76.2 m) long and 36 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesExit Glacier Road
CrossesResurrection River
Location7.5 Miles West of Seward
RouteFederal Lands Road 0
StateAlaska
Coordinates60.19481, -149.58864
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68 US tons
Inventory rating45 US tons

Structure

MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length250 ft (76.2 m)
Longest span125 ft (38.1 m)
Deck width36 ft (11.1 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2013)
Projected traffic500 by 2033
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerNational Park Service
Maintained byNational Park Service
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Exit Glacier Road over Resurrection River built?

It was built in 1985, making it 40 years old in 2025.

What condition is Exit Glacier Road over Resurrection River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.

How much traffic does Exit Glacier Road over Resurrection River carry?

About 200 vehicles per day (2013 count), of which roughly 2% are trucks.

How long is Exit Glacier Road over Resurrection River?

The structure is 250 ft (76.2 m) long with a longest span of 125 ft (38.1 m) and a deck 36 ft wide.

Who owns Exit Glacier Road over Resurrection River?

It is owned by the National Park Service.