US Bridges

Mission Avenue over Ninilchik River

Good

Kenai Peninsula Borough, Alaska · Mile Point 0.2 · Structure no. 0427

Built
2014
11 years old
Condition
Good
inspected August 2023
Type
Tee Beam
Prestressed Concrete
Length
128 ft
1 main span
Daily traffic
180
2020 count
Owner
State
State Highway Agency

About this bridge

Mission Avenue over Ninilchik River is a prestressed concrete tee beam carrying Mission Avenue over Ninilchik River in Kenai Peninsula Borough, Alaska. It was built in 2014, so it is 11 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 180 vehicles a day, roughly 6% of them trucks, projected to reach 210 by 2039. The structure is 128 ft (39 m) long and 35 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesMission Avenue
CrossesNinilchik River
LocationMile Point 0.2
RouteState Highway 0
StateAlaska
Coordinates60.04833, -151.66472
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating109.8 US tons
Inventory rating65.8 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHL 93
Structure length128 ft (39 m)
Longest span124 ft (37.8 m)
Deck width35 ft (10.7 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic180 (2020)
Projected traffic210 by 2039
Trucks6%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mission Avenue over Ninilchik River built?

It was built in 2014, making it 11 years old in 2025.

What condition is Mission Avenue over Ninilchik River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Mission Avenue over Ninilchik River carry?

About 180 vehicles per day (2020 count), of which roughly 6% are trucks.

How long is Mission Avenue over Ninilchik River?

The structure is 128 ft (39 m) long with a longest span of 124 ft (37.8 m) and a deck 35 ft wide.

Who owns Mission Avenue over Ninilchik River?

It is owned by the State Highway Agency.