US Bridges

Gustavus Airport R over Salmon River

Poor

Hoonah-Angoon Census Area, Alaska · Mile Point 1.5 · Structure no. 0444

Built
1976
49 years old
Condition
Poor
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
158 ft
3 main spans
Daily traffic
1,020
2020 count
Owner
State
State Highway Agency

About this bridge

Gustavus Airport R over Salmon River is a steel continuous stringer/multi-beam or girder carrying Gustavus Airport R over Salmon River in Hoonah-Angoon Census Area, Alaska. It was built in 1976, so it is 49 years old, older than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

It carries about 1,020 vehicles a day, roughly 4% of them trucks, projected to reach 3,560 by 2039. The structure is 158 ft (48.2 m) long and 26 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesGustavus Airport R
CrossesSalmon River
LocationMile Point 1.5
RouteState Highway NSP00
StateAlaska
Coordinates58.4126, -135.738
Functional classRural Major Collector

Condition and inspection

Poor

The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure4 PoorAdvanced section loss, deterioration, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating73 US tons
Inventory rating39.8 US tons

Structure

MaterialSteel Continuous
DeckWood or timber
Main spans3
Design loadHS 20
Structure length158 ft (48.2 m)
Longest span53 ft (16.2 m)
Deck width26 ft (7.8 m)
Roadway width25 ft (7.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,020 (2020)
Projected traffic3,560 by 2039
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Gustavus Airport R over Salmon River built?

It was built in 1976, making it 49 years old in 2025.

What condition is Gustavus Airport R over Salmon River in?

The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in May 2023.

How much traffic does Gustavus Airport R over Salmon River carry?

About 1,020 vehicles per day (2020 count), of which roughly 4% are trucks.

How long is Gustavus Airport R over Salmon River?

The structure is 158 ft (48.2 m) long with a longest span of 53 ft (16.2 m) and a deck 26 ft wide.

Who owns Gustavus Airport R over Salmon River?

It is owned by the State Highway Agency.