US Bridges

Porcupine Road over Glacier Creek

Good

Haines Borough, Alaska · Mile Point 10.8 · Structure no. 1637

Built
2023
2 years old
Condition
Good
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
60 ft
1 main span
Daily traffic
10
2018 count
Owner
State
State Park, Forest, or Reservation Agency

About this bridge

Porcupine Road over Glacier Creek is a steel stringer/multi-beam or girder carrying Porcupine Road over Glacier Creek in Haines Borough, Alaska. It was built in 2023, so it is 2 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10 vehicles a day, roughly 1% of them trucks, projected to reach 12 by 2035. The structure is 60 ft (18.3 m) long and 14 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesPorcupine Road
CrossesGlacier Creek
LocationMile Point 10.8
RouteState Lands Road 0
StateAlaska
Coordinates59.41759, -136.30156
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment4: Meets minimum tolerable limits to be left in place as is
Operating rating59.9 US tons
Inventory rating36 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans1
Design loadHS 20 + Mod
Structure length60 ft (18.3 m)
Longest span59 ft (18 m)
Deck width14 ft (4.3 m)
Roadway width14 ft (4.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10 (2018)
Projected traffic12 by 2035
Trucks1%
Lanes on structure1
Traffic directionOne-lane bridge for two-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Park, Forest, or Reservation Agency
Maintained byState Park, Forest, or Reservation Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Porcupine Road over Glacier Creek built?

It was built in 2023, making it 2 years old in 2025.

What condition is Porcupine Road over Glacier Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Porcupine Road over Glacier Creek carry?

About 10 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is Porcupine Road over Glacier Creek?

The structure is 60 ft (18.3 m) long with a longest span of 59 ft (18 m) and a deck 14 ft wide.

Who owns Porcupine Road over Glacier Creek?

It is owned by the State Park, Forest, or Reservation Agency.