US Bridges

Lutak Spur over Chilkoot River

Fair

Haines Borough, Alaska · Mile Point 4.8 · Structure no. 0387

Built
1979
46 years old
Condition
Fair
inspected May 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
200 ft
5 main spans
Daily traffic
90
2020 count
Owner
State
State Highway Agency

About this bridge

Lutak Spur over Chilkoot River is a steel stringer/multi-beam or girder carrying Lutak Spur over Chilkoot River in Haines Borough, Alaska. It was built in 1979, so it is 46 years old, older than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 90 vehicles a day, roughly 12% of them trucks, projected to reach 100 by 2039. The structure is 200 ft (61 m) long and 27 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesLutak Spur
CrossesChilkoot River
LocationMile Point 4.8
RouteState Highway NSP00
StateAlaska
Coordinates59.32436, -135.55749
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating54.7 US tons
Inventory rating25.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans5
Design loadH 15
Structure length200 ft (61 m)
Longest span40 ft (12.2 m)
Deck width27 ft (8.2 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic90 (2020)
Projected traffic100 by 2039
Trucks12%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNavigation control on waterway (bridge permit required)

Frequently asked questions

When was Lutak Spur over Chilkoot River built?

It was built in 1979, making it 46 years old in 2025.

What condition is Lutak Spur over Chilkoot River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.

How much traffic does Lutak Spur over Chilkoot River carry?

About 90 vehicles per day (2020 count), of which roughly 12% are trucks.

How long is Lutak Spur over Chilkoot River?

The structure is 200 ft (61 m) long with a longest span of 40 ft (12.2 m) and a deck 27 ft wide.

Who owns Lutak Spur over Chilkoot River?

It is owned by the State Highway Agency.