Tok Cutoff over Mabel Creek
FairCounty 066, Alaska · Mile Point 75.3 · Structure no. 0656
- Built
- 2006
- 19 years old
- Condition
- Fair
- inspected July 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 122 ft
- 1 main span
- Daily traffic
- 220
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Tok Cutoff over Mabel Creek is a prestressed concrete tee beam carrying Tok Cutoff over Mabel Creek in County 066, Alaska. It was built in 2006, so it is 19 years old, younger than the Alaska average of 35.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 220 vehicles a day, roughly 21% of them trucks, projected to reach 290 by 2039. The structure is 122 ft (37.2 m) long and 39 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tok Cutoff over Mabel Creek built?
It was built in 2006, making it 19 years old in 2025.
What condition is Tok Cutoff over Mabel Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Tok Cutoff over Mabel Creek carry?
About 220 vehicles per day (2020 count), of which roughly 21% are trucks.
How long is Tok Cutoff over Mabel Creek?
The structure is 122 ft (37.2 m) long with a longest span of 117 ft (35.7 m) and a deck 39 ft wide.
Who owns Tok Cutoff over Mabel Creek?
It is owned by the State Highway Agency.