Irr:old Align Rich over Klutina River
FairCounty 066, Alaska · Mile Point 0.5 · Structure no. 0572
- Built
- 1957
- 68 years old, rebuilt 1999
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 243 ft
- 2 main spans
- Daily traffic
- 480
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Irr:old Align Rich over Klutina River is a steel continuous stringer/multi-beam or girder carrying Irr:old Align Rich over Klutina River in County 066, Alaska. It was built in 1957 and reconstructed in 1999, so it is 68 years old, older than the Alaska average of 35.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 480 vehicles a day, roughly 10% of them trucks, projected to reach 580 by 2039. The structure is 243 ft (74.1 m) long and 26 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Irr:old Align Rich over Klutina River built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1999.
What condition is Irr:old Align Rich over Klutina River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Irr:old Align Rich over Klutina River carry?
About 480 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Irr:old Align Rich over Klutina River?
The structure is 243 ft (74.1 m) long with a longest span of 120 ft (36.6 m) and a deck 26 ft wide.
Who owns Irr:old Align Rich over Klutina River?
It is owned by the State Highway Agency.