US Bridges

Pt Whitshed RD Ext over No Name Creek

Good

County 063, Alaska · Mile Point 6.2 · Structure no. 2292

Built
2012
13 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
100 ft
1 main span
Daily traffic
50
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Pt Whitshed RD Ext over No Name Creek is a steel stringer/multi-beam or girder carrying Pt Whitshed RD Ext over No Name Creek in County 063, Alaska. It was built in 2012, so it is 13 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 50 vehicles a day, roughly 1% of them trucks, projected to reach 60 by 2035. The structure is 100 ft (30.5 m) long and 33 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesPt Whitshed RD Ext
CrossesNo Name Creek
LocationMile Point 6.2
RouteCity Street 0
StateAlaska
Coordinates60.48755, -145.8812
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating110.1 US tons
Inventory rating66.8 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length100 ft (30.5 m)
Longest span97 ft (29.6 m)
Deck width33 ft (10.1 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic50 (2018)
Projected traffic60 by 2035
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Pt Whitshed RD Ext over No Name Creek built?

It was built in 2012, making it 13 years old in 2025.

What condition is Pt Whitshed RD Ext over No Name Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Pt Whitshed RD Ext over No Name Creek carry?

About 50 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is Pt Whitshed RD Ext over No Name Creek?

The structure is 100 ft (30.5 m) long with a longest span of 97 ft (29.6 m) and a deck 33 ft wide.

Who owns Pt Whitshed RD Ext over No Name Creek?

It is owned by the City or Municipal Highway Agency.