IRR BIA RTE 6068 over Swampy Slough
GoodClosed to trafficBethel Census Area, Alaska · In Front of School · Structure no. 0000E02255T0650
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 532 ft
- 17 main spans
- Daily traffic
- 400
- 2019 count
- Owner
- Tribal
- Indian Tribal Government
About this bridge
IRR BIA RTE 6068 over Swampy Slough is a wood or timber stringer/multi-beam or girder carrying IRR BIA RTE 6068 over Swampy Slough in Bethel Census Area, Alaska. It was built in 2014, so it is 11 years old, younger than the Alaska average of 35.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: closed to all traffic.
It carries about 400 vehicles a day, projected to reach 600 by 2039. The structure is 532 ft (162.3 m) long and 10 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IRR BIA RTE 6068 over Swampy Slough built?
It was built in 2014, making it 11 years old in 2025.
What condition is IRR BIA RTE 6068 over Swampy Slough in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does IRR BIA RTE 6068 over Swampy Slough carry?
About 400 vehicles per day (2019 count).
How long is IRR BIA RTE 6068 over Swampy Slough?
The structure is 532 ft (162.3 m) long with a longest span of 20 ft (6.1 m) and a deck 10 ft wide.
Who owns IRR BIA RTE 6068 over Swampy Slough?
It is owned by the Indian Tribal Government.