US Bridges

Seward Highway over Omalley Undercrossing

Fair

Anchorage Municipality, Alaska · Mile Point 119.8 · Structure no. 1380

Built
1978
47 years old
Condition
Fair
inspected June 2023
Type
Tee Beam
Prestressed Concrete
Length
170 ft
2 main spans
Daily traffic
31,400
2020 count
Owner
State
State Highway Agency

About this bridge

Seward Highway over Omalley Undercrossing is a prestressed concrete tee beam carrying Seward Highway over Omalley Undercrossing in Anchorage Municipality, Alaska. It was built in 1978, so it is 47 years old, older than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 31,400 vehicles a day, roughly 17% of them trucks, projected to reach 38,700 by 2039. The structure is 170 ft (51.8 m) long and 101 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSeward Highway
CrossesOmalley Undercrossing
LocationMile Point 119.8
RouteInterstate 0A31
StateAlaska
Coordinates61.12306, -149.85667
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.6 US tons
Inventory rating25.6 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length170 ft (51.8 m)
Longest span82 ft (25.1 m)
Deck width101 ft (30.7 m)
Roadway width96 ft (29.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic31,400 (2020)
Projected traffic38,700 by 2039
Trucks17%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Seward Highway over Omalley Undercrossing built?

It was built in 1978, making it 47 years old in 2025.

What condition is Seward Highway over Omalley Undercrossing in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does Seward Highway over Omalley Undercrossing carry?

About 31,400 vehicles per day (2020 count), of which roughly 17% are trucks.

How long is Seward Highway over Omalley Undercrossing?

The structure is 170 ft (51.8 m) long with a longest span of 82 ft (25.1 m) and a deck 101 ft wide.

Who owns Seward Highway over Omalley Undercrossing?

It is owned by the State Highway Agency.