Brayton Drive over Campbell CR E Frontage
GoodAnchorage Municipality, Alaska · Mile Point 0.6 · Structure no. 1157
- Built
- 2013
- 12 years old
- Condition
- Good
- inspected June 2023
- Type
- Tee Beam
- Prestressed Concrete
- Length
- 180 ft
- 2 main spans
- Daily traffic
- 1,400
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Brayton Drive over Campbell CR E Frontage is a prestressed concrete tee beam carrying Brayton Drive over Campbell CR E Frontage in Anchorage Municipality, Alaska. It was built in 2013, so it is 12 years old, younger than the Alaska average of 35.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,400 vehicles a day, roughly 10% of them trucks, projected to reach 1,830 by 2039. The structure is 180 ft (54.9 m) long and 26 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Brayton Drive over Campbell CR E Frontage built?
It was built in 2013, making it 12 years old in 2025.
What condition is Brayton Drive over Campbell CR E Frontage in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.
How much traffic does Brayton Drive over Campbell CR E Frontage carry?
About 1,400 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Brayton Drive over Campbell CR E Frontage?
The structure is 180 ft (54.9 m) long with a longest span of 88 ft (26.7 m) and a deck 26 ft wide.
Who owns Brayton Drive over Campbell CR E Frontage?
It is owned by the State Highway Agency.