Seward Highway over Placer River Overflow

Good

Anchorage Municipality, Alaska · Mile Point 77.0 · Structure no. 0627

Built
2022
3 years old
Condition
Good
inspected June 2023
Type
Tee Beam
Prestressed Concrete
Length
375 ft
3 main spans
Daily traffic
3,900
2020 count
Owner
State
State Highway Agency

About this bridge

Seward Highway over Placer River Overflow is a prestressed concrete tee beam carrying Seward Highway over Placer River Overflow in Anchorage Municipality, Alaska. It was built in 2022, so it is 3 years old, younger than the Alaska average of 35.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 9 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 3,900 vehicles a day, roughly 15% of them trucks, projected to reach 8,666 by 2039. The structure is 375 ft (114.3 m) long and 54 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesSeward Highway
CrossesPlacer River Overflow
LocationMile Point 77.0
RouteInterstate 0A32
StateAlaska
Coordinates60.82, -149.00083
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck9 ExcellentNo problems noted.
Superstructure9 ExcellentNo problems noted.
Substructure9 ExcellentNo problems noted.
Channel and channel protection9 ExcellentNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation9: Superior to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating110.1 US tons
Inventory rating75.2 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckOther
Main spans3
Design loadHL 93
Structure length375 ft (114.3 m)
Longest span122 ft (37.2 m)
Deck width54 ft (16.5 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,900 (2020)
Projected traffic8,666 by 2039
Trucks15%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Seward Highway over Placer River Overflow built?

It was built in 2022, making it 3 years old in 2025.

What condition is Seward Highway over Placer River Overflow in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Seward Highway over Placer River Overflow carry?

About 3,900 vehicles per day (2020 count), of which roughly 15% are trucks.

How long is Seward Highway over Placer River Overflow?

The structure is 375 ft (114.3 m) long with a longest span of 122 ft (37.2 m) and a deck 54 ft wide.

Who owns Seward Highway over Placer River Overflow?

It is owned by the State Highway Agency.